How one Manufacturer Achieved a Quick 27% Reduction in Downtime from IIoT Implementation

Case Study Results:

  • 58% increase in productivity within a year
  • Decrease of 29% in the amount of downtime
  • Length of downtimes reduced by 70%
  • 6% decrease in direct labor cost per unit
  • Increased production by at least 6,612 units/month
  • 1,425$/month savings in downtime costs